Gurugram's Rs 1.5 Crore Road Fiasco: Sector 45 Crumbles Just Months After Lavish Upgrade
Share- Nishadil
- October 06, 2025
- 0 Comments
- 2 minutes read
- 2 Views

Residents of Gurugram are once again left fuming as a crucial road in Sector 45 has dramatically crumbled, a mere six months after undergoing a significant upgrade costing a whopping Rs 1.5 crore. This disheartening development has ignited widespread anger and raised serious questions about the quality of infrastructure projects and the accountability of civic authorities in the rapidly developing city.
The extensively repaired and supposedly improved stretch of road, which serves as a vital artery for daily commuters, has deteriorated rapidly, developing potholes, cracks, and uneven surfaces that make travel hazardous and uncomfortable.
The rapid collapse is particularly galling given the substantial public funds invested in its renovation, leading to accusations of blatant negligence and the use of substandard materials by contractors.
Local residents, who had initially welcomed the road upgrade with optimism, now express profound disappointment and frustration.
Many have voiced their concerns, highlighting that the previous condition of the road, while poor, did not warrant such a quick and complete disintegration after a costly overhaul. They point out that the investment was meant to provide a long-lasting solution, not a temporary patch-up that fails within half a year.
Civic activists and local RWA members are demanding an immediate investigation into the matter.
They are urging authorities to identify those responsible for the shoddy construction work and to ensure that strict action is taken against them. The incident has become a stark symbol of the larger problem of infrastructure quality in Gurugram, where lavish spending often fails to translate into durable and reliable public assets.
Experts suggest that such rapid degradation often points to fundamental flaws in planning, execution, or material procurement.
Factors like improper sub-base preparation, inadequate drainage, and the use of low-grade asphalt can contribute to premature road failure. Residents are now calling for greater transparency in tendering processes and more rigorous quality checks during and after construction projects.
As the monsoon season approaches, the crumbling road poses an even greater risk, potentially leading to waterlogging and further damage, exacerbating traffic woes and endangering commuters.
The community's patience is wearing thin, and there's a collective plea for accountability, demanding that the authorities not only repair the road but also implement measures to prevent such expensive and embarrassing failures from recurring in the future.
.Disclaimer: This article was generated in part using artificial intelligence and may contain errors or omissions. The content is provided for informational purposes only and does not constitute professional advice. We makes no representations or warranties regarding its accuracy, completeness, or reliability. Readers are advised to verify the information independently before relying on