Bengaluru's Grand Vision: A 17.5 KM Double-Decker Flyover to Transform Commute
Share- Nishadil
- September 06, 2025
- 0 Comments
- 2 minutes read
- 9 Views

Bengaluru, the Silicon Valley of India, is constantly grappling with the challenges of rapid urbanization, none more pressing than its infamous traffic congestion. In a bold and ambitious move to alleviate this gridlock and usher in a new era of urban mobility, the city is embarking on the construction of its longest double-decker flyover, a monumental 17.5-kilometer stretch designed to revolutionize how Bengalureans travel.
This pioneering infrastructure project is not just a flyover; it's an integrated transport corridor, seamlessly blending vehicular movement with the city's expanding Metro network.
Stretching along the vital Outer Ring Road (ORR) West, from JP Nagar 4th Phase all the way to Kempapura, this double-decker marvel will feature two distinct levels. The first, lower deck will be dedicated to easing the flow of road traffic, providing a much-needed bypass over congested intersections.
Above it, the second, elevated deck will host the Namma Metro trains, forming a crucial segment of the highly anticipated Metro Phase 3.
The Bengaluru Metro Rail Corporation Limited (BMRCL), the driving force behind the city's metro expansion, is spearheading this colossal undertaking. With an estimated cost of Rs 3,250 crore for the double-decker flyover alone, it represents a significant investment in the city's future.
This 17.5-kilometer corridor is a core component of the broader Metro Phase 3 project, which encompasses a 44.65-kilometer stretch with an overall estimated cost of Rs 15,611 crore. While the entire Metro Phase 3 is slated for completion by 2028, residents can look forward to the transformative impact of this specific double-decker section contributing significantly to improved connectivity.
The entire 17.5 km elevated structure will be developed in two main segments: from JP Nagar to Mysuru Road, and then from Mysuru Road to Kempapura.
This strategic division ensures efficient project management and execution. Along this vital stretch, BMRCL plans to establish 18 new Metro stations, providing convenient access points for thousands of commuters and integrating key residential and commercial hubs into the metro network. This dual-level design is an ingenious solution, maximizing limited urban space to deliver both immediate traffic relief and sustainable public transport options.
Upon its completion, this longest double-decker flyover in Bengaluru is set to be a game-changer.
It promises to drastically cut down travel times, reduce fuel consumption, and significantly lower pollution levels along one of the city's busiest arteries. More than just a piece of infrastructure, it symbolizes Bengaluru's unwavering commitment to smart urban planning and a sustainable future, paving the way for a more connected, efficient, and livable city for all its residents.
.Disclaimer: This article was generated in part using artificial intelligence and may contain errors or omissions. The content is provided for informational purposes only and does not constitute professional advice. We makes no representations or warranties regarding its accuracy, completeness, or reliability. Readers are advised to verify the information independently before relying on