Delhi | 25°C (windy)

Mumbai Metro's Green Line 4 Reaches New Milestone: Trial Run Initiated on Vital Cadbury Junction-Gaimukh Stretch

  • Nishadil
  • September 21, 2025
  • 0 Comments
  • 1 minutes read
  • 7 Views
Mumbai Metro's Green Line 4 Reaches New Milestone: Trial Run Initiated on Vital Cadbury Junction-Gaimukh Stretch

Mumbai's eagerly anticipated Green Line 4 (Wadala-Kasarvadavali-Gaimukh) Metro project has achieved a significant milestone, with the Mumbai Metropolitan Region Development Authority (MMRDA) commencing a crucial trial run on the Cadbury Junction to Gaimukh elevated section. This momentous event, which took place on Monday, marks a major step forward in the completion of this vital public transport corridor for the bustling metropolis.

The trial run, conducted on the elevated corridor between Cadbury Junction and Gaimukh, represents the final phase of operational testing for the northernmost stretch of the Green Line 4.

This particular section is critical as it connects key residential and commercial hubs, promising to ease congestion and provide a faster, more efficient commute for thousands of Mumbaikars once fully operational. The initiation of trials signifies that the civil work and track laying on this segment are substantially complete, paving the way for integrated system testing.

Officials from the MMRDA are meticulously overseeing the trial run, which involves rigorous checks of the metro's systems, including signaling, telecommunications, track infrastructure, and the operational readiness of the trains themselves.

These comprehensive tests are crucial to ensure safety, reliability, and seamless integration with the existing metro network. The goal is to identify and resolve any potential issues before the line is opened for public service, ensuring a world-class travel experience.

The Green Line 4, once fully commissioned, will span approximately 32.32 kilometers, connecting Wadala in the south to Gaimukh in the north, via Kasarvadavali.

It is expected to significantly enhance connectivity across the Eastern and Western suburbs, offering a much-needed alternative to road transport and suburban railway lines, which are often overcrowded. This line is projected to cater to an immense daily ridership, thereby alleviating traffic woes and contributing to a greener, more sustainable urban environment.

The successful execution of this trial run instills further confidence in the timely completion of the entire Green Line 4 corridor.

For the residents and commuters of Mumbai, this development brings the dream of a comprehensive, modern metro network closer to reality, promising a future of quicker, more comfortable, and eco-friendly travel across the city.

.

Disclaimer: This article was generated in part using artificial intelligence and may contain errors or omissions. The content is provided for informational purposes only and does not constitute professional advice. We makes no representations or warranties regarding its accuracy, completeness, or reliability. Readers are advised to verify the information independently before relying on