Nova Scotia's Renewable Energy Future Takes Flight: The Benjamins Mill Wind Farm
Share- Nishadil
- September 22, 2025
- 0 Comments
- 2 minutes read
- 3 Views

The winds of change are sweeping through Hants County, Nova Scotia, not just figuratively, but literally, as the first colossal wind turbine has been erected at the Benjamins Mill wind farm. This monumental event marks a tangible leap forward for the province's ambitious renewable energy goals, setting the stage for a greener, more sustainable future.
Located amidst the rolling landscapes of Benjamins Mill, this massive undertaking by the Benjamins Mill Wind Limited Partnership, a collaborative venture between Potentia Renewables Inc.
and the Wskijnu'k Mtmo'taqnuow Agency (representing 13 Mi'kmaw communities), is poised to become a cornerstone of Nova Scotia's energy transition. With plans for 22 towering turbines, the farm will boast a formidable generating capacity of 114 megawatts – enough clean energy to power an astonishing 32,000 homes.
Nova Scotia has set an ambitious target: 80% of its electricity to come from renewable sources by 2030.
Projects like Benjamins Mill are absolutely critical in achieving this goal, significantly reducing the province's reliance on fossil fuels and mitigating its carbon footprint. The sight of these modern giants rising against the sky is a powerful symbol of progress, demonstrating a real commitment to tackling climate change.
These aren't just any turbines; they are engineering marvels.
Each turbine's hub stands an impressive 118 metres tall, with blades stretching 82 metres in length. When fully assembled and rotating, the tip of a blade can reach nearly 200 metres into the sky, making them some of the tallest structures in the region. Their sheer scale is breathtaking, a testament to human ingenuity harnessed for environmental benefit.
Bringing these massive components to rural Hants County has been a logistical feat in itself.
Blades, tower sections, and nacelles—the turbine's 'engine room'—arrive by ship at Hantsport and are then meticulously transported by specialized vehicles along carefully planned routes. This complex choreography ensures that each piece arrives safely for assembly. The project is on track for full operation by late 2025, promising a steady stream of clean electricity for decades to come.
Beyond the environmental advantages, the Benjamins Mill wind farm also brings economic benefits to the region, including job creation during construction and ongoing maintenance roles.
The partnership with the Wskijnu'k Mtmo'taqnuow Agency underscores a commitment to shared prosperity and meaningful Indigenous participation in large-scale renewable energy developments, forging a path towards reconciliation and sustainable economic growth for all.
As more turbines continue to ascend at Benjamins Mill, they will stand as beacons of Nova Scotia's dedication to a cleaner, brighter future.
This project isn't just about generating electricity; it's about powering a vision for a province that leads in renewable energy, demonstrating how innovation and collaboration can transform our energy landscape and protect our planet for generations to come. The future is indeed blowing in the wind, and Nova Scotia is ready to harness its power.
.Disclaimer: This article was generated in part using artificial intelligence and may contain errors or omissions. The content is provided for informational purposes only and does not constitute professional advice. We makes no representations or warranties regarding its accuracy, completeness, or reliability. Readers are advised to verify the information independently before relying on