Bengaluru's Pothole Peril: The Long-Awaited Fix Kicks Off on Bannerghatta Road!
Share- Nishadil
- September 27, 2025
- 0 Comments
- 1 minutes read
- 1 Views

Bengaluru, often celebrated for its vibrant tech scene and dynamic culture, has long grappled with a less desirable reputation: its notoriously pockmarked roads. But a glimmer of hope has emerged for commuters, particularly those navigating the bustling Bannerghatta Road. After persistent public outcry and the city's annual monsoon battle, significant pothole repair work has officially commenced, promising smoother, safer journeys ahead.
The Bruhat Bengaluru Mahanagara Palike (BBMP) is spearheading this crucial initiative, with Chief Commissioner Tushar Giri Nath himself overseeing the start of operations.
His presence underscores the seriousness with which the civic body is approaching this perennial problem. During his inspection, Giri Nath didn't mince words, delivering a stern directive to contractors: utilize only the highest quality materials and ensure the repairs stand the test of time, committing to a minimum two-year guarantee on all fixed stretches.
This renewed push is a direct follow-up to instructions issued on September 25th, highlighting a proactive stance by the BBMP.
The city has been plagued by over 16,000 identified potholes, a figure that paints a stark picture of the challenges faced by daily commuters. The monsoons, while vital for the city's water supply, inevitably exacerbate these issues, turning minor cracks into gaping hazards.
Citizens, who have long been at the receiving end of these road woes, now have a more direct channel to voice their concerns.
The 'My Bengaluru My Road' app serves as a critical interface for reporting road damage, allowing the BBMP to track and address complaints efficiently. This digital platform is expected to foster greater accountability and responsiveness in maintaining the city's vast road network.
The Chief Commissioner has laid down an ambitious, yet much-needed, deadline: all identified potholes across Bengaluru must be repaired by October 31st.
This firm timeline aims to instill urgency and ensure that contractors adhere to a strict schedule, preventing the usual delays and substandard work that have historically frustrated residents. The emphasis now is not just on filling holes, but on ensuring durable, long-lasting solutions that truly transform Bengaluru's driving experience.
With continuous monitoring promised, residents are hopeful that this time, the repairs will hold, paving the way for a smoother, safer city.
.Disclaimer: This article was generated in part using artificial intelligence and may contain errors or omissions. The content is provided for informational purposes only and does not constitute professional advice. We makes no representations or warranties regarding its accuracy, completeness, or reliability. Readers are advised to verify the information independently before relying on